Agriculture & Gardenings

Agriculture & Gardenings

We helped our customers to develop and mass produce plants growing products for smart indoor hydroponic farms that used in the world’s leading restaurants, corporate cafeterias and food halls, injection molds for various specifications of plant pots exported to European and North America.

Trusted by Leading Agriculture & Gardenings Companies

Why Choose ACO Mold Services

Faster Cycle Times

Advanced molding facilities enable greater production efficiency to help us deliver orders within tight deadlines.

Tight Tolerances

We machine parts with greater accuracy and tolerances as tight as +/- 0.005mm in to get the right fit based on your requirements.

Industry Leading Quality

Every part meets high industry expectations. Having high precision molding capabilities and thorough testing, we produce parts that perform strongly under any condition

How We Build Injection Molded Parts to Support Your Agriculture & Gardenings Business

01 Quotation
02 DFM & Mold Design
03 Mold Making
04 Mold Trial
05 Troubleshooting
06 Molding Production
07 The Packing and Shipping
08 Reorder Parts from Your Tool
shutterstock 181395617

ACO provide quotation in 24 hours with detailed mold solution and pricing based on your product requirements and budget, much more than just a price,  through quotation process our professionals offer you one stop consultation service including design, manufacturing, molding production, packing and shipping, lead time etc.

shutterstock 1723998664

Within 1-2 days we evaluate your part design and provide optimized proposals for better performance and manufacturability, present you the concept of the mold design for initial evaluation.

Once DFM report agreed, the detailed 3D mold design will be completed in 2-3 days.

P02 2 S06 pic3

Typically mold making takes 3-5 weeks depends on complexity, we provide weekly report with photos and video to keep you updated with each steps of machining job along the whole processing.

mold trail

Once the molds are completed, we will set it up for mold trial to verify the injection mold mechanism functionality and product completeness/accuracy, 5-10 shots free samples will be sent to customers for evaluation.

P02 2 S06 troubleshooting

We might not get 100% prefect injection mold/molded parts at the first time mold trail due to machining, fitting, parameter setting etc., usually it takes 1-2 rounds modification and mold trail before the mold is ready for mass production.

P02 2 S06 mass production

We get into mass production once the mold is verified and sample approved by customers, internal quality acceptance standard will be aligned to the samples approved by customers, mass production lead time depends on the demand quantity, mold production cycle.

P1 s03 pic04

Standard packing method are PE bags and carton box, special case may need extra care and sometimes customized packing method, we provide door to door shipping services at customer’s request by sea freight, air freight and train freight.

P02 2 S06 reorder

We keep your molds in secure storage and do regular maintenance to ensure the mold is immediate ready for your new demands, we keep all production data in records and do repeat orders accordingly to provide you consistently high quality parts from batch to batch.

Support Your Business with Better
Molding Solution

Customer Feedback

P03 1 Customer say 02
P07 2 1 case studies

Got Any Ideas on Your Project?

Please contact us using the form below or by emailing sales@acomold.com

    Contact Info
    Copyright © 2023, ACO Mold. Terms of Service and Privacy Policy. All rights reserved.  Powered by ACO MOLD.
    图层 1 1

    Get A Free Quote

    Please fill in the form below or contact us via email : sales@acomold.com